下穿铁路编组站大跨度架空顶进地道桥关键技术研究
收稿日期: 2016-03-17
修回日期: 2016-05-11
网络出版日期: 2016-06-29
Study of Key Construction Technologies for Largespan Overhead Jacking of Underpass Bridge Crossing underneath Railway Marshalling Station
Received date: 2016-03-17
Revised date: 2016-05-11
Online published: 2016-06-29
倪伟伟 , 张俊岱 , 黄伟 . 下穿铁路编组站大跨度架空顶进地道桥关键技术研究[J]. 隧道建设, 2016 , 36(6) : 740 -747 . DOI: 10.3973/j.issn.1672-741X.2016.06.014
The North Zhengzhou Railway Station is the largest railway marshalling station in Asian areas. The overhead jacking of underpass bridge crossing underneath North Zhengzhou Railway Station has many difficulties, i.e. large crosssection of underpass bridge box, long jacking distance, large overhead area, hard line fixing, limited overhead point and overhead horizontal beam and complex structural system conversion, etc. The underpass bridge jacking is analyzed and the jacking force and overhead system are calculated. The sectional overhead and opposite jacking method is adopted in the end.
/
| 〈 |
|
〉 |