- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
基坑混凝土支撑轴力监测数据异常情况分析与探讨
收稿日期: 2016-02-01
修回日期: 2016-03-09
网络出版日期: 2016-08-17
Analysis and Discussion of Monitoring Data Anomaly of Axial Force for Concrete Support of Foundation Pit
Received date: 2016-02-01
Revised date: 2016-03-09
Online published: 2016-08-17
张哲 . 基坑混凝土支撑轴力监测数据异常情况分析与探讨[J]. 隧道建设, 2016 , 36(8) : 976 -981 . DOI: 10.3973/j.issn.1672-741X.2016.08.013
The analysis and discussion are made on monitoring data anomaly of axial force for concrete support of Xujiapeng Station on Line No. 8 of Wuhan Railway Transit. The rationality of monitoring data alarming is studied; comparison among similar projects is made; and some countermeasures are discussed. Some conclusions are drawn as follows: 1) The axial force of concrete support measured after concrete casting and curing and before foundation pit excavation should be taken as initial value. 2) The temperature affects the axial force obviously. 3) The precision of reinforced bar gauge used for concrete support axial force monitoring is not good. Finally, some countermeasures and suggestions are given.
/
| 〈 |
|
〉 |