Visualized Monitoring Technology for Segment Sinking and Installation of Honggu Tunnel in Nanchang
Received date: 2016-05-10
Revised date: 2016-06-25
Online published: 2016-09-20
张伟 , 张毅 , 李志军 . 南昌红谷隧道管节沉放安装可视化监测技术[J]. 隧道建设, 2016 , 36(9) : 1120 -1124 . DOI: 10.3973/j.issn.1672-741X.2016.09.014
A visualized monitoring system is used in segment installation of Honggu Tunnel in Nanchang, so as to guarantee the segment installation precision and rapid construction. A visualized model is established according to data collection and process based on total station and GPS. The comparison results between measured data and theoretical calculation ones show that the visualized monitoring system is highefficient and can meet the segment installation precision and speed up the segment installation of immersed tunnel.
/
| 〈 |
|
〉 |