Comparison between Bench Method and Fullface Method for Ping’an Soft Rock Tunnel on ChengduLanzhou Railway
Received date: 2016-07-08
Revised date: 2016-11-03
Online published: 2016-11-30
鲜国 . 软岩隧道台阶法与全断面(含仰拱)法施工比较研究——以成兰铁路平安隧道为例[J]. 隧道建设, 2016 , 36(11) : 1302 -1309 . DOI: 10.3973/j.issn.1672-741X.2016.11.003
Comparison between bench method and fullface method (including invert arch) for soft rock section of Ping’an Tunnel on ChengduLanzhou Railway is made in terms of surrounding rock deformation, primary support stress and construction organization by using numerical simulation, theoretical calculation and site test. The study results show that: 1) The stability of surrounding rock of tunnel constructed by bench method is superior to that constructed by fullface method; and the accumulated deformation of tunnel constructed by fullface method is smaller than that constructed by bench method. 2) The sizes of shear zone and tensile failure zone of tunnel constructed by 2 methods are almost the same. The construction quality of tunnel constructed by fullface method is easier to control. 3) The fullface method is superior to bench method in terms of labor and construction schedule.
/
| 〈 |
|
〉 |