- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2016-05-09
修回日期: 2016-07-27
网络出版日期: 2016-11-30
Construction Technologies for Large Crosssection Tunnel Using Mining Method to Enlarge Shield Tunnel
Received date: 2016-05-09
Revised date: 2016-07-27
Online published: 2016-11-30
陈瑞征 , 胡威东 , 李新平 . 矿山法扩挖盾构隧道修建大断面隧道施工技术[J]. 隧道建设, 2016 , 36(11) : 1372 -1378 . DOI: 10.3973/j.issn.1672-741X.2016.11.014
The connection section between left line of Line No. 2 of Zhengzhou Metro and connecting tunnel of Line No. 1 and Line No. 2 are constructed together. The surrounding environment is complicated and the construction schedule is tight. The large crosssection tunnel construction technology, mining method, is adopted to enlarge the shield tunnel. The section is bored by shield, and then the steel segments, the bench method of central pillar + temporary invert and inverse enlarging method are adopted. The construction practice shows that the ground settlement and the construction schedule have been controlled effectively. The abovementioned technologies can provide reference for similar projects in the future.
Key words: shield method; mining method; enlargement; bench method; steel segment
/
| 〈 |
|
〉 |