- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2016-09-03
修回日期: 2016-10-28
网络出版日期: 2016-12-30
Study of Transfer Scheme among Jinrongjie Station, Existing Transfer Station and Planning Station of Beijing Metro
Received date: 2016-09-03
Revised date: 2016-10-28
Online published: 2016-12-30
刘志广 , 张金伟 , 段婉玲 . 北京地铁金融街站与既有换乘站、规划车站换乘方案研究[J]. 隧道建设, 2016 , 36(12) : 1492 -1499 . DOI: 10.3973/j.issn.1672-741X.2016.12.013
The transfer among newlybuilt Metro station, existing transfer station and planning Metro station becomes more and more common with the rapid development of urban rail transit; and it becomes more and more important to realize integration between rail transit and urban space. The transfer scheme among Jinrongjie Station, existing transfer station and planning station of Beijing Metro is analyzed by site investigation and static calculation preliminarily; and then it is assessed by dynamic simulation of passenger flow. Two transfer schemes and some suggestions are given. The results can provide reference for design of urban space integration of similar projects in the future.
/
| 〈 |
|
〉 |