Countermeasures for Failure of Shield Receiving of Xiqingdao StationNanyunhe Station Section on Line No. 6 of Tianjin Metro
Received date: 2016-02-01
Revised date: 2016-07-18
Online published: 2016-12-30
李海 , 朱长松 . 天津地铁6号线西青道站—南运河站区间盾构到达接收措施失效处理实例[J]. 隧道建设, 2016 , 36(12) : 1512 -1516 . DOI: 10.3973/j.issn.1672-741X.2016.12.016
The stopping of water leakage and slurry leakage of shield receiving shaft are very important and difficult. A series of technologies, i.e. filling of opencut tunnel, grouting in tunnel, polyurethane filling for main tunnel structure and tunnel portal freezing, have been adopted in water leakage stopping of shield receiving shaft of Xiqingdao StationNanyunhe Station section on Line No. 6 of Tianjin Metro. The construction results show that the abovementioned technologies are feasible and effective.
/
| 〈 |
|
〉 |