- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2016-07-20
修回日期: 2016-11-04
网络出版日期: 2016-12-30
基金资助
国家重点基础研究发展计划(“973”计划)项目(2014CB046906); 中国铁路总公司科技研究开发计划(2016G004-A); 中国隧道集团科技创新计划(隧研合2016-03)
Discussion on Design of TBM with High Adaptability to Gaoligongshan Tunnel
Received date: 2016-07-20
Revised date: 2016-11-04
Online published: 2016-12-30
陈馈 , 杨延栋 . 高黎贡山隧道高适应性TBM设计探讨[J]. 隧道建设, 2016 , 36(12) : 1523 -1530 . DOI: 10.3973/j.issn.1672-741X.2016.12.018
The development of TBM with high adaptability to complex geological conditions of Gaoligongshan Tunnel is very important. The main bad geological conditions of Gaoligongshan Tunnel are summarized; the construction risks, i.e. TBM jamming at softweak broken section and large deformation section, rockburst of tunnel face with high ground stress and behind shield, support failure induced by convergence squeezing deformation of surrounding rock, water gushing with high pressure and high temperature, are analyzed. Furthermore, design scheme of TBM with high adaptability are proposed, including support system design, cutting tool and cutterhead design, water gushing treatment design, high ground heat treatment design and other related design. The study results can provide reference for design and selection of equipment manufacturing of TBM with high adaptability to Gaoligongshan Tunnel.
Key words: Gaoligongshan Tunnel; open TBM; construction risk; adaptability design
/
| 〈 |
|
〉 |