- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
HSP法在引汉济渭TBM隧道地质预报中的应用
收稿日期: 2016-08-26
修回日期: 2016-10-24
网络出版日期: 2017-03-04
基金资助
科学技术部项目(20142EG123034); 中国铁路总公司重大课题(2016G004-A)
Application of HSP (Horizontal Sonic Profiling) Sound Wave Reflection Method to Geological Prediction of TBM Tunnel of Hanjiang RiverWeihe River Water Diversion Project
Received date: 2016-08-26
Revised date: 2016-10-24
Online published: 2017-03-04
卢松 , 李苍松 , 吴丰收 , 周运金 . HSP法在引汉济渭TBM隧道地质预报中的应用[J]. 隧道建设, 2017 , 37(2) : 236 -241 . DOI: 10.3973/j.issn.1672-741X.2017.02.017
During the construction of TBM, advanced geological prediction and TBM rapid construction often affects each other. As a result, the difficulties of geological prediction are analyzed; and then the working principle and method of HSP sound wave reflection method applied to TBM construction are introduced based on the characteristics of TBM construction. The vibration of rock induced by TBM cutterhead is regarded as vibration source signal; and then the array typed pole arrangement method is used to collect characteristics of the ground ahead. The comparison between analytical results and actual application of HSP sound wave reflection method applized to geological prediction of TBM tunnel of Hanjiang RiverWeihe River Water Diversion Project shows that the HSP sound wave reflection method is feasible and highlyefficient in geological prediction of bad geological conditions.
/
| 〈 |
|
〉 |