- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
“短孔卸压降振法”对周边孔爆破减振效果的研究
收稿日期: 2016-07-28
修回日期: 2016-09-27
网络出版日期: 2017-03-30
基金资助
国家自然科学基金项目(10672091); 青岛巿建委科技项目资助(JK2013-4)
Study of Influence of Shorthole Pressure Relieving and Vibration Reduction Method on Blasting Vibration Reduction Effect of Peripheral Holes
Received date: 2016-07-28
Revised date: 2016-09-27
Online published: 2017-03-30
李梓源 , 王海亮 . “短孔卸压降振法”对周边孔爆破减振效果的研究[J]. 隧道建设, 2017 , 37(3) : 315 -320 . DOI: 10.3973/j.issn.1672-741X.2017.03.009
In order to study the influence of shorthole pressure relieving and vibration reduction method on the blasting vibration reduction effect of peripheral holes, the tunnel crosssection model before and after setting pressure reducing short holes are calculated and analyzed by ANSYSDYNA numerical simulation software; the blasting tests are carried out on tunnel crosssection before and after setting pressure reducing short holes; and then comparison is made on vibration velocity diagrams collected before and after setting of pressure reducing short holes. The results show that: 1) The blasting vibration velocity of peripheral holes after using shorthole pressure relieving and vibration reduction method is smaller than that before using shorthole pressure relieving and vibration reduction method. 2) The tunnel excavation contour line goes smooth and shaped; and the overbreak and underbreak times have been reduced by using shorthole pressure relieving and vibration reduction method.
/
| 〈 |
|
〉 |