研究与探索

“短孔卸压降振法”对周边孔爆破减振效果的研究

  • 李梓源 ,
  • 王海亮
展开
  • (山东科技大学矿山灾害预防控制教育部重点实验室, 山东 青岛 266510)
李梓源(1991—),男,河北邢台人,山东科技大学地下空间工程与安全专业在读硕士,研究方向为地下空间工程与安全、爆破安全。Email: shankelzy@163.com。

收稿日期: 2016-07-28

  修回日期: 2016-09-27

  网络出版日期: 2017-03-30

基金资助

国家自然科学基金项目(10672091); 青岛巿建委科技项目资助(JK2013-4)

Study of Influence of Shorthole Pressure Relieving and Vibration Reduction  Method on Blasting Vibration Reduction Effect of Peripheral Holes

  • LI Ziyuan ,
  • WANG Hailiang
Expand
  • (Key Laboratory of Mine Disaster Prevention and Control, Shandong University of  Science & Technology, Qingdao 266510, Shandong, China)

Received date: 2016-07-28

  Revised date: 2016-09-27

  Online published: 2017-03-30

摘要

为了解“短孔卸压降振法”对周边孔最大振速的影响程度,利用多自由面削减能量的原理,首先采用ANSYS-DYNA数值模拟软件对设置“卸压短孔”前后的断面模型进行计算分析,其次结合现场对设置“卸压短孔”前后的隧道断面爆破试验,提取爆破后的振速图进行对比论证,从而得出设置“卸压短孔”前的断面爆破振速大于设置后的断面爆破振速的结论。结果表明: 1)使用“短孔卸压降振法”后,断面周边孔振动速度有所降低; 2)采用“短孔卸压降振法”进行控制爆破后,隧道开挖轮廓线成型平整,超欠挖现象显著减少。

本文引用格式

李梓源 , 王海亮 . “短孔卸压降振法”对周边孔爆破减振效果的研究[J]. 隧道建设, 2017 , 37(3) : 315 -320 . DOI: 10.3973/j.issn.1672-741X.2017.03.009

Abstract

In order to study the influence of shorthole pressure relieving and vibration reduction method on the blasting vibration reduction effect of peripheral holes, the tunnel crosssection model before and after setting pressure reducing short holes are calculated and analyzed by ANSYSDYNA numerical simulation software; the blasting tests are carried out on tunnel crosssection before and after setting pressure reducing short holes; and then comparison is made on vibration velocity diagrams collected before and after setting of pressure reducing short holes. The results show that: 1) The blasting vibration velocity of peripheral holes after using shorthole pressure relieving and vibration reduction method is smaller than that before using shorthole pressure relieving and vibration reduction method. 2) The tunnel excavation contour line goes smooth and shaped; and the overbreak and underbreak times have been reduced by using shorthole pressure relieving and vibration reduction method.