引松供水4标TBM连续穿越灰岩的施工技术研究
收稿日期: 2016-11-25
修回日期: 2017-01-25
网络出版日期: 2017-03-30
基金资助
国家“973”计划(2014CB046906); 中国铁路总公司科技研究开发计划(2016G004-A); 中铁隧道集团科技创新计划(隧研合2016-03)
Research on Construction Technologies for TBM Continuous Boring through Limestone Section of Bid Section No.4 of Songhua River Water Conveyance Project
Received date: 2016-11-25
Revised date: 2017-01-25
Online published: 2017-03-30
赵海雷 , 陈馈 , 周建军 , 张兵 , 阳斌 , 王振飞 . 引松供水4标TBM连续穿越灰岩的施工技术研究[J]. 隧道建设, 2017 , 37(3) : 354 -362 . DOI: 10.3973/j.issn.1672-741X.2017.03.015
The open TBM bores through limestone section of 7 km long of Bid Section No. 4 of Songhua River Water Conveyance Project. The advanced geological prediction system and lining system of TBM are designed based on characteristics, i.e. long distance, large crosssection, rapid boring and strengthened support of the project. And then, corresponding construction technologies and countermeasures are decided for bad geological conditions. The TBM has successfully bored through the limestone section; the construction cost has been reduced and the construction schedule has been shortened by relevant design, construction technologies and countermeasures adopted.
/
| 〈 |
|
〉 |