- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
成都地铁4号线二期盾构隧道漂卵石专项勘察分析
收稿日期: 2016-11-01
修回日期: 2016-12-30
网络出版日期: 2017-04-28
Special Survey and Analysis of Boulders and Pebbles of Shield Tunnel of Phase Ⅱ of Chengdu Metro Line No. 4
Received date: 2016-11-01
Revised date: 2016-12-30
Online published: 2017-04-28
桂金祥 , 李建强 , 王佳亮 . 成都地铁4号线二期盾构隧道漂卵石专项勘察分析[J]. 隧道建设, 2017 , 37(4) : 476 -485 . DOI: 10.3973/j.issn.1672-741X.2017.04.014
In order to learn the distribution, content, diameter and strength of boulders and machine tool coefficient, nature intensity and hydrogeological characteristics of boulders and pebbles met on west extended section of Phase Ⅱ of Chengdu Metro Line No. 4, a series of methods, i.e. insitu well group dewatering, manual excavation of largediameter exploratory well, reinforced concrete retaining wall, underground geological compilation and measuring, site K30 test, intensity tests, sampling and hydrogeological tests of boulders, are carried out. The construction method selection, tunnel buried depth and shield type selection are analyzed; the potential geotechnical issues occuring during shield tunneling are predicted. Finally, some countermeasures and surveying method for boulders and pebbles are suggested.
/
| 〈 |
|
〉 |