- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2017-01-09
修回日期: 2017-03-28
网络出版日期: 2017-09-28
基金资助
河北省交通运输厅2013年度科研项目 (201302025)
Determination of Ultimate Relative Displacements of Primary Support of Mountaincrossing Highway Tunnel
Received date: 2017-01-09
Revised date: 2017-03-28
Online published: 2017-09-28
徐东强 , 燕鹏 , 李彦奇 , 王可意 . 公路山岭隧道初期支护极限相对位移的确定[J]. 隧道建设, 2017 , 37(9) : 1083 -1089 . DOI: 10.3973/j.issn.1672-741X.2017.09.004
In order to calculate the ultimate relative displacement of primary support of mountaincrossing highway tunnel, the HoekBrown criterion is adopted; the highway tunnel standards, crosssection pattern, supporting methods and material properties are taken as references; short bench excavation method is adopted; and the ultimate relative displacements of crown top, arch springer and arch feet of the threelane highway tunnel under different grades of surrounding rocks and buried depths are simulated and calculated by software FLAC3D and are further determined by catastrophe theory. According to the statistical analysis of calculation results, it is pointed out that the deformation control points of the tunnel surrounding can be defined clearly and the buried depth can be refined; by analyzing the influences of benches excavation on deformation of different points and comparing to field construction, the influence of the excavation step on the displacement of tunnel surrounding can be determined.
/
| 〈 |
|
〉 |