- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2017-02-10
修回日期: 2017-05-25
网络出版日期: 2017-09-28
Study of Deformation Control Scheme of Breakthrough Section of Soft Rock Muzhailing Tunnel on LanzhouChongqing Railway with Extremely High Ground Stress
Received date: 2017-02-10
Revised date: 2017-05-25
Online published: 2017-09-28
李沿宗 , 尤显明 , 赵爽 . 极高地应力软岩隧道贯通段变形控制方案研究——以兰渝铁路木寨岭隧道为例[J]. 隧道建设, 2017 , 37(9) : 1146 -1152 . DOI: 10.3973/j.issn.1672-741X.2017.09.013
The deformation control of the core breakthrough section of soft rock mountaincrossing tunnel with extremely high ground stress is very difficult. The field test is carried out and the data collected are analyzed by taking Muzhailing Tunnel on LanzhouChongqing Railway for example. Some conclusions are drawn as follows: 1) The length of the core breakthrough section crossing mountain is determined. 2) The comprehensive deformation control scheme of “fourlayer tunnel primary support structure + radial grouting + long anchor bolt + long anchor rope” [JP2]for core breakthrough section crossing mountain is proposed. 3) The deformation control effect of multilayer support structure of the breakthrough section is good. 4) The construction scheme and deformation control scheme for breakthrough section are rational.
/
| 〈 |
|
〉 |