Assembling Technology for Partial Segment of Shield with Horseshoeshaped Crosssection
Received date: 2017-02-08
Revised date: 2017-04-21
Online published: 2017-09-28
李飞宇 , 胡燕伟 , 李龙飞 . 马蹄形盾构负环管片拼装技术[J]. 隧道建设, 2017 , 37(9) : 1162 -1166 . DOI: 10.3973/j.issn.1672-741X.2017.09.015
The partial segment assembly is very important to shield launching, and the assembly method will affect the project′s schedule, shield launching and the assembling quality of the following rings (i.e. inclination and rolling angle, etc). The assembling steps of the partial segment of Baicheng Tunnel of MHTJ01 Bid Section on Menghua Railway are presented when shield launching; the positioning and fixing method of the segments during assembling of the partial ring are studied; and the supporting mode of the horseshoeshaped segment is designed. Finally, a suit of scientific, safe, highefficient and instructive assembling method of noncircular shield segment is developed.
/
| 〈 |
|
〉 |