Mechanical Analysis of Shield Cutterhead Modification for a Metro Project
Received date: 2017-03-16
Revised date: 2017-07-31
Online published: 2017-10-26
吴遁 , 黎虎 , 刘玉江 , 陈阵 . 某地铁工程盾构刀盘改造力学分析[J]. 隧道建设, 2017 , 37(10) : 1328 -1333 . DOI: 10.3973/j.issn.1672-741X.2017.10.018
The original structure of the cutterhead needs to be improved; and the mechanical properties of the cutterhead need to be analyzed before and after modification so as to realize shield tunneling in medium sand stratum with rich water. The theoretical calculation of the cutterhead load under conditions of earth pressure balance and unbalance is implemented; and then the finite element method is used to study the stress and deformation of shield cutterhead before and after modification. The study results show that: 1)The maximum equivalent stress and the maximum deformation of the cutterhead under condition of earth pressure unbalance are higher than that under condition of earth pressure balance. 2)For the same condition, the maximum equivalent stress of cutterhead varies little before and after modification; while the maximum deformation increased by about 10%; the maximum equivalent stress is located in the cutter plate and the bracket; and the maximum deformation is located in the bottomleft edge and the aboveright edge of the cutterhead. After modification, the strength and rigidity of the cutterhead can meet the construction requirements; and it has good tunneling effect and efficiency.
/
| 〈 |
|
〉 |