Conversion of Top Plate on Propulsion Beam of a Kind of Threeboom Rockdrilling Jumbo
Received date: 2015-05-15
Revised date: 2017-10-09
Online published: 2017-12-09
胡卫平 . 一种三臂凿岩台车推进梁上顶盘的改造[J]. 隧道建设, 2017 , 37(11) : 1488 -1491 . DOI: 10.3973/j.issn.2096-4498.2017.11.020
In order to improve the control precision of overbreak and underbreak of tunnel when using rockdrilling jumbo, the top plate structure on propulsion beam of a kind of threeboom rock drilling jumbo is analyzed. The fault, overlarge distance between guide hole of drilling pipe of top plate and longitudinal horizontal line of the tunnel, exists in the structural design of the original top plate, which leads to difficult control of extrapolation angle of the drill and further would affect the control precision of overbreak and underbreak. [JP2]As a result, optimization, i. e. reducing the extrapolation angle of the drill by shortening the distance between guide hole of drilling pipe of top plate and longitudinal horizontal line of the tunnel, is carried out; so that the overbreak and underbreak of tunnel have been effectively controlled.
/
| 〈 |
|
〉 |