紧邻深大长基坑的地铁结构保护对策与实践
收稿日期: 2017-07-20
修回日期: 2017-10-25
网络出版日期: 2018-02-01
Protection Coutermeasures for Metro Structure Adjacent to Deep and Large Foundation Pit
Received date: 2017-07-20
Revised date: 2017-10-25
Online published: 2018-02-01
冯国健 . 紧邻深大长基坑的地铁结构保护对策与实践[J]. 隧道建设, 2018 , 38(1) : 103 -109 . DOI: 10.3973/j.issn.2096-4498.2018.01.013
The foundation pit construction induced additional stress and displacement of adjacent metro structure would affect the operation and safety of the metro structure. In order to guarantee the safety of Guangzhou South Metro Station during the coutinuous construction of adjacent deep and large foundation pit, the countermeasures, i.e. phased and sectioned construction, ground consolidation, uplift pile, sprouted excavation, surcharging and back pressuring, disturbulance control and monitoring strengthening, are adopted. The displacement and deformation of the metro structure have been effectively controlled; and then the rationalities of the abovementioned countermeasures have been verified. The results can provide reference for similar projects in the future.
/
| 〈 |
|
〉 |