大直径盾构刀盘刀具选型及常压换刀技术研究
收稿日期: 2017-07-31
修回日期: 2017-11-27
网络出版日期: 2018-02-01
Study of Cutterhead and Cutting Tool Selection and Cutting Tool Replacement of Largediameter Shield under Atmospheric Condition
Received date: 2017-07-31
Revised date: 2017-11-27
Online published: 2018-02-01
陈健 . 大直径盾构刀盘刀具选型及常压换刀技术研究[J]. 隧道建设, 2018 , 38(1) : 110 -117 . DOI: 10.3973/j.issn.2096-4498.2018.01.014
Due to the different cutting mechanisms and configurations of the cutting tools in soft soil stratum and the rock stratum, the adaptive configuration of the cutting tool and the replacement safety of the worn tool in different geologies, especially in complex geology, are the technical problems encountered during largediameter shield tunneling. The selection and configuration of the cutting tools in soft soil and hard rock composite strata are analyzed by taking largediameter slurry shield used in Yangtze Rivercrossing tunnel on Wuhan Metro Line No. 8 for example; the design concept of composite cutterhead is innovatively adopted; the interchange technology of hob cutter and toothed cutter under atmospheric condition is developed and carried out; and the cutting tool configuration schemes are given for different geological conditions, By adopting the abovementioned measures,the service life of the cutting tool is prolonged; the cutting efficiency of the cutting tool is improved; the construction risk is reduced; and the successful shield tunneling in complex strata is realized.
/
| 〈 |
|
〉 |