国家自然科学基金资助项目(51578460); 国家重点研发计划(2016YFC0802205)
Insitu Study of Mechanical Characteristics of Shield Tunnel Segment Structure in SandyCobble Strata Crossing Yellow River
Received date: 2017-07-30
Revised date: 2017-10-30
Online published: 2018-02-25
陈中天 , 王飞 , 陶力铭 , 汪辉武 , 方勇 . 下穿黄河砂卵石地层盾构隧道管片结构受力特征现场测试[J]. 隧道建设, 2017 , 37(S2) : 147 -153 . DOI: 10.3973/j.issn.2096-4498.2017.S2.022
Lanzhou Metro Line No. 1 is the first underwater tunnel project which crosses the Yellow River and belongs to urban rail transit. The tunnel passes through high permeability sandycobble strata, and the engineering condition is special. The mechanical behavior of segment in different construction stages and the water pressure acting on the segment are analyzed through insitu test and numerical simulation, and the variation rules of segment internal force in different construction stages are revealed. The research results show that: 1) The external water pressure and internal force are significantly affected by the construction of shield in the range of 3-5 rings to the tunnel face, within which the strengthen detection methods should be used at the tensile zone and corresponding measures should be taken to prevent the damage of the segment in the early stage of construction. 2) The water pressure and internal force are gradually unaffected by construction in the range of 6-13 rings and tend to be stable after the 13th ring. 3) The segment designed by beamspring mode is safe, but the construction load should be fully considered.
/
| 〈 |
|
〉 |