Application of Long Trestle for Inverted Arch to Loess Tunnel Construction
Received date: 2017-07-30
Revised date: 2017-10-30
Online published: 2018-02-25
苏辉 . 长仰拱栈桥在黄土隧道施工中的应用[J]. 隧道建设, 2017 , 37(S2) : 192 -197 . DOI: 10.3973/j.issn.2096-4498.2017.S2.029
In order to ensure the construction safety of loess tunnel, rapid ring closure of primary support structure and the construction quality of inverted arch and filling, long trestle for inverted arch is used according to nonblasting excavation of loess tunnel. The formwork erection time is reduced and the inverted arch concrete compacting quality is improved by setting inverted arch formwork and concrete vibrator on long trestle. By adopting the abovementioned technologies, the tunnel excavation, primary support, inverted arch excavation and secondary lining have been carried out in order, the construction efficiency and economic and social benefits have been improved.
Key words: loess tunnel; inverted arch; long trestle; primary support; concrete
/
| 〈 |
|
〉 |