断层破碎带巷道基于钢管混凝土支架的复合支护技术研究及应用
收稿日期: 2017-04-03
修回日期: 2017-09-16
网络出版日期: 2018-03-19
基金资助
国家自然科学基金资助项目(51704176、51474218、51404105); 山东建筑大学博士基金资助项目(XNBS1403)
Research and Application of Composite Support Technology Based on Concretefilled Steel Tubular Scaffold to Tunnel in Fault and Fracture Zone
Received date: 2017-04-03
Revised date: 2017-09-16
Online published: 2018-03-19
为解决阳城煤矿-650南翼轨道大巷断层破碎带支护中出现的围岩变形大和变形持续时间长等问题,采用室内实验、理论计算和支护实践相结合的方法,对-650南翼轨道大巷围岩地质进行测试研究,揭示巷道原有支护变形破坏机制,提出断层破碎带巷道承压环强化支护设计方法,并由此设计基于钢管混凝土支架的复合支护设计方案。实验及理论分析得出: 钢管混凝土支架支护反力为0.92 MPa,基于钢管混凝土支架的复合支护体总体承载力达到1.37 MPa,超过预估围岩压力。支护实践表明: 基于194 mm×8 mm浅底拱圆形钢管混凝土支架复合支护方案能够有效控制巷道变形,抑制底鼓,保证了-650南翼轨道大巷的长期稳定。
王军 , 王正泽 , 丁厚刚 , 郭毕钧 , 顾薛青 . 断层破碎带巷道基于钢管混凝土支架的复合支护技术研究及应用[J]. 隧道建设, 2018 , 38(2) : 277 -286 . DOI: 10.3973/j.issn.2096-4498.2018.02.017
Large surrounding rock deformation occurs in support of fault and fracture zone of -650 south tunnel of Yangcheng Coal Mine; and the deformation lasts for a long time. As a result, the surrounding rock geology of -650 south tunnel is tested and studied by indoor experiment, theoretical calculation and support practice; the deformation failure mechanism of the original tunnel support is revealed; the design method for pressurebearing ring support strengthening is put forward; and the composite support method based on concretefilled steel tubular scaffold is designed. The theoretical analysis and experiment show that the counterforce of concretefilled steel tubular scaffold reaches 0.92 MPa and the bearing capacity of composite support based on concretefilled steel tubular scaffold reaches 1.37 MPa, which has exceeded the predicted surrounding rock pressure. The support practice shows that the tunnel deformation can be effectively controlled and the longterm stability of -650 south tunnel can be guaranteed by using composite support based on 194×8 shallow arch concretefilled steel tubular scaffold.
/
| 〈 |
|
〉 |