桃树坪隧道穿越富水粉细砂地层塌方处治施工技术
收稿日期: 2017-06-19
修回日期: 2017-11-13
网络出版日期: 2018-03-19
Countermeasures for Collapse of Taoshuping Tunnel Crossing Waterrich Finesand Strata
Received date: 2017-06-19
Revised date: 2017-11-13
Online published: 2018-03-19
张学文 . 桃树坪隧道穿越富水粉细砂地层塌方处治施工技术[J]. 隧道建设, 2018 , 38(2) : 308 -315 . DOI: 10.3973/j.issn.2096-4498.2018.02.021
Taoshuping tunnel, a Grade Ⅰ doubleline railway tunnel, crosses tertiary waterrich finesand strata. As a result of the poor diagenesis of finesand strata and bad selfstability when mixing water, the tunnel construction is difficult and the easily encountering of collapse is difficult to treat. In order to deal with the abovementioned problems and guarantee rapid construction of the Taoshuping # 3 Tunnel, the technology of "vacuum dewatering+doublelayer large pipe roof+small pipe roof+doubleside drift method" is discussed and summarized to provide reference for similar projects in the future.
/
| 〈 |
|
〉 |