地下工程支护-结构一体管幕预筑法技术及发展
收稿日期: 2017-06-08
修回日期: 2017-11-14
网络出版日期: 2018-04-11
Technology and Development of SupportStructure Integral Piperoofing Preconstruction Method for Underground Works
Received date: 2017-06-08
Revised date: 2017-11-14
Online published: 2018-04-11
李积栋 , 油新华 , 肖龙鸽 . 地下工程支护-结构一体管幕预筑法技术及发展[J]. 隧道建设, 2018 , 38(3) : 456 -460 . DOI: 10.3973/j.issn.2096-4498.2018.03.013
The supportstructure integral piperoofing preconstruction method is new for underground works. The core idea of the method, permanent structure of metro station goes first and then fullface soil excavation, is different from the traditional one. The key technologies of the method include longdistance jacking of largediameter steel pipe, spatial cutting and welding of pipe roof and construction of reinforced concrete structure in small space. The practice shows that the method, which integrates reinforcement, support and main structure, can reduce the excavation and support process and temporary support, control the ground defromation effectively and guarantee good working environment.
Key words: underground work; piperoofing preconstruction; steel pipe; support
/
| 〈 |
|
〉 |