跨孔CT法在地铁工程桩基间距探测中的应用
收稿日期: 2018-03-12
修回日期: 2018-05-09
网络出版日期: 2018-06-01
Application of Crosshole CT Method to Pile Foundation Distance Detection of Metro Engineering
Received date: 2018-03-12
Revised date: 2018-05-09
Online published: 2018-06-01
周坤 , 王华 . 跨孔CT法在地铁工程桩基间距探测中的应用[J]. 隧道建设, 2018 , 38(5) : 747 -752 . DOI: 10.3973/j.issn.2096-4498.2018.05.004
An urban metro tunnel crosses the pile foundation of an existing bridge abutment; and the pile foundation is close to the contour line of the metro tunnel (about 1.0 m); hence, great impact would be induced by shield construction. In order to reduce the risk of shield construction and ensure the smooth construction of the tunnel, the distance between pile foundations should be detected before construction to provide the basis for determining the construction scheme of shield tunneling. Due to the limitation of the ground traffic and construction space condition, geophysical methods can only be used for detection. The comparison results show that by using three kinds of crosshole CT methods can meet relevant requirements. Finally, the borehole verification is carried out according to the detection results; the results show that the geophysical exploration results are accurate and reliable.
/
| 〈 |
|
〉 |