沉管隧道纵向静力计算问题探讨
收稿日期: 2017-03-07
修回日期: 2018-03-06
网络出版日期: 2018-06-01
Discussion on Longitudinal Static Calculation of Immersed Tunnel
Received date: 2017-03-07
Revised date: 2018-03-06
Online published: 2018-06-01
苏宗贤 , 陈韶章 , 陈越 , 苏慈 . 沉管隧道纵向静力计算问题探讨[J]. 隧道建设, 2018 , 38(5) : 790 -796 . DOI: 10.3973/j.issn.2096-4498.2018.05.011
In order to further comprehensively calculate the longitudinal internal force and deformation of long immersed tunnel, and to ensure the joints′ watertightness, the calculation models for longitudinal static analysis of immersed tunnel and some problems, i.e. the joint mechanics, selection of GINA gasket with its and watertightness verification and relationship among longitudinal settlement difference, longitudinal bending moment and shear force, etc., are discussed. And then the simple and efficient elastic foundation beam calculation model and joint simulation methods are summarized; the 3D shell models with stratumstructure mode and forced displacement method are put forward for supplementary detailed analysis. Finally, it is pointed out that the curvature and curvature variation rate of the longitudinal settlement curve of the tunnel affect respectively the longitudinal bending moment and shear force of the structure; and it is given that how the selection work and watertightness verification of water seal cooperate with longitudinal calculation of tunnel structure.
/
| 〈 |
|
〉 |