- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2018-03-16
修回日期: 2018-05-27
网络出版日期: 2018-06-19
基金资助
厦门市科技计划重大项目(3502Z20151006)
Prediction of Disc Cutter Wear of Shield Used in Seacrossing Section on Xiamen Rail Transit Line No. 3
Received date: 2018-03-16
Revised date: 2018-05-27
Online published: 2018-06-19
杨育 . 厦门轨道交通3号线跨海段盾构滚刀磨损预测[J]. 隧道建设, 2018 , 38(S1) : 182 -187 . DOI: 10.3973/j.issn.2096-4498.2018.S1.028
In order to effectively control the cutter replacement risk and improve the efficiency of seacrossing shield tunneling, the scalereduced disc cutter wear experiment and rock abrasion experiment of different rocks are carried out, by taking complex strata of seacrossing section on Xiamen Rail Transit Line No. 3 for example. And then the power exponential relationship between the wear rate of cutter material and CAI value of rock abrasion is revealed; and the method for predicting the consumption of cutter by measuring the CAI of rock samples of the proposed project is established. Finally, the method mentioned above is applied to the prediction of disc cutter replacement distances of shield in intermediatelyslightly weathered granite of Xiamen Rail Transit Line No. 3, and the prediction results are 50 m for edge disc cutter and 215 m for front disc cutter; base on which the advices for disc cutter replacement positions and methods are provide. The results can provide reference for similar projects in the future.
/
| 〈 |
|
〉 |