- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2018-03-19
修回日期: 2018-04-13
网络出版日期: 2018-07-28
基金资助
国家自然科学基金资助项目(51378435,51508476)
Experimental Study of Relationship between Hysteretic Deformation and Lining Stiffness of Fractured Argillaceous Rock Tunnel
Received date: 2018-03-19
Revised date: 2018-04-13
Online published: 2018-07-28
冯冀蒙 , 李洪涛 , 张俊儒 , 丁晓琦 , 陈政 . 破碎泥质岩隧道滞后形变与衬砌刚度关系规律试验研究[J]. 隧道建设, 2018 , 38(7) : 1164 -1171 . DOI: 10.3973/j.issn.2096-4498.2018.07.012
The deterioration processes of surrounding rock of Xiaozhai Tunnel on YunGui Railway during excavation and supporting and after supporting are simulated by laboratory model experiments; and the surrounding rock pressure, displacement and internal force of the secondary lining are studied during deterioration progress. The study results show that: (1) The stiffness of the lining has an significant influence on the deformation control of argillaceous rock tunnel. (2) The larger the stiffness of the lining is, the larger the surrounding rock pressure, the internal force and maximum bending moment are, and the lining is more prone to cracking. (3) For the actual situation of Xiaozhai Tunnel, primary support with a thickness of 30 cm + I25b steel frame + C35 reinforced concrete with a diameter of 40 cm is a better supporting structure.
/
| 〈 |
|
〉 |