Settlement Analysis of Steel Pipe Roof Jacking in Ultrashallow Covered Soft Ground
Received date: 2017-09-29
Revised date: 2018-03-15
Online published: 2018-07-28
苏荣军 , 陈立生 . 软土地层浅覆土下钢管幕顶进沉降分析[J]. 隧道建设, 2018 , 38(7) : 1236 -1242 . DOI: 10.3973/j.issn.2096-4498.2018.07.021
The rules and mechanism of ground settlement induced by steel piperoof jacking in ultrashallow covered soft ground of improvement project on Tianlin Road in Shanghai are studied. And then the developments of primary settlement, cumulative settlement and postconstruction settlement of ground are analyzed by field test. Finally, the ground settlement rules under different working conditions are studied. The study results show that: (1) The maximum ground surface settlement after field test is 9.8 mm; the construction of pipe roof group has a cumulative effect on ground surface settlement. (2) The ground uplift occurs in the latter half when single pipe jacking, which is within accuracy range. (3) The change of soil settlement in the range of steel pipe roof burial depth above pipe roof is obvious; the postconstruction settlement of sequential pipe is much larger; and by adopting hole sealing measures, the ground loss can be reduced effectively.
/
| 〈 |
|
〉 |