Application of Outerhole Delay Detonating Circuit to Blasting Construction of Tunnel Laterally Crossing Dangerous Building
Received date: 2018-03-14
Revised date: 2018-04-23
Online published: 2018-10-26
尹文纲 , 王海亮 , 张祖远 , 张富强 . 孔外延期网路在隧道侧穿危楼爆破中的应用研究[J]. 隧道建设, 2018 , 38(10) : 1723 -1728 . DOI: 10.3973/j.issn.2096-4498.2018.10.017
The separated detonation of singlehole singlesection blasting should be carried out due to the limit of number of detonators. Hence, a new detonation circuit is proposed for the blasting excavation of tunnel laterally crossing dangerous building, i.e. using 20 sections of common detonator to carry out outerhole delay detonating between different detonation circuits and 3 sections of common detonators to carry out outerhole delay detonating in each detonation circuit. The field testing results show that by adopting the new detonation circuit: (1) the detonating time is reduced by 3 (from 5 to 2); (2) vibration peak of the new detonation circuit is almost as the same as that of original one; (3) the average vibration peak increases by 5%; and (4) no vibration superposition is identified.
/
| 〈 |
|
〉 |