Study of Application Technology of Chute Embedded Outside Metro Shield Segment
Received date: 2018-03-14
Revised date: 2018-07-17
Online published: 2018-10-26
靳世鹤 , 孙红斌 , 李强年 , 张海军 . 地铁盾构管片外嵌式槽道应用技术研究[J]. 隧道建设, 2018 , 38(10) : 1729 -1733 . DOI: 10.3973/j.issn.2096-4498.2018.10.018
The preembedded chute for shield segment cannot be replaced resulting from fullring embedding. Hence, the technology of chute embedded outside shield segment is studied by theoretical analysis and site experiment from the aspects of feasibility and safety, by taking Phase 1 of Lanzhou Metro Line No. 2 for example. It is concluded that: (1) The technology of chute embedded outside shield segment can meet relevant requirements; it is replaceable and easy to install; and by doing which 40% cost can be reduced. (2) The technology mentioned above is feasible for metro shield tunnel, highspeed railway shield tunnel, mined tunnel and urban utility tunnels; and it is worth popularizing.
Key words: Lanzhou Metro; shield segment; outsideembedded chute; preembedded chute
/
| 〈 |
|
〉 |