Study of Construction Technology of Separate Launching of Shield under Narrow and Small Space
Received date: 2018-03-26
Revised date: 2018-11-23
Online published: 2019-01-30
卜星玮 , 曾波存 , 万飞明 , 杜鹏 , 全自洋 , 王林涛 . 狭小空间条件下盾构分体始发施工技术研究[J]. 隧道建设, 2018 , 38(S2) : 292 -297 . DOI: 10.3973/j.issn.2096-4498.2018.S2.039
In the BafenshanDrainage Reconstruction of Wuhan JiangxiaClear River Discharge Project, due to the narrow and small space of the launch shaft of shield tunnel, shield tunneling equipment assembly and launch tunneling can not be carried on by adopting conventional launching construction technology. In order to solve such problem, the engineering hydrogeology, launchshaft and tunnel structure are analyzed and studied. Some parts of the shield such as subsidiary facilities, temporary ringand slag discharging systemare modified. Temporary propulsion devices are added.Finally a kind of separate construction technology with the combination of partial assembly and partial propulsion is proposed.The construction technique can solve the problems of limited launching space, shield assembly, launching and equipment parts vertical transportation, personal access and so on.The launching process is safe and smooth and the ground settlement meets the requirements, indicating that the effect of the separate launching technology is good.
/
| 〈 |
|
〉 |