- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
铁路隧道工程超挖回填费用计算规则研究
收稿日期: 2018-07-23
修回日期: 2018-08-26
网络出版日期: 2019-02-01
Study of Calculation Rules of Backfill Cost of Railway Tunnel Overbreak
Received date: 2018-07-23
Revised date: 2018-08-26
Online published: 2019-02-01
吴炜 , 张恒辉 . 铁路隧道工程超挖回填费用计算规则研究[J]. 隧道建设, 2019 , 39(1) : 81 -84 . DOI: 10.3973/j.issn.2096-4498.2019.01.010
In order to meet the related engineering quantity computing rules of shotcrete and lining concrete in TZJ 20032017 Budget Quota of Railway Project (Chapter 3: Tunnel Engineering), the unified calculation rules of backfill quantity and cost of tunnel overbreak is studied. Based on the general referenced sketch of doubletrack tunnel of 350 km/h passengerdedicated line and related design codes and construction technology regulations, the simple and convenient calculation rules of quantities of allowable overbreak and reserved deformation and quantity and cost of tunnel backfill are proposed; and the quantity and cost of tunnel backfill under different surrounding rock grades calculated by new and existing budget quota are compared. The results show that by adopting the new budget quota, the quantity of tunnel backfill decreases under surrounding rock grades of Ⅱand Ⅲ, while increases under surrounding rock grades of Ⅳ and Ⅴ, and the quota cost of tunnel backfill increases by RMB 700 per meter to RMB 1 100 per meter.
Key words: railway tunnel; budget quota; tunnel overbreak and backfill; backfill cost
/
| 〈 |
|
〉 |