研究与探索

大跨地铁隧道组合工法穿越断层时的围岩变形控制分析

  • 唐晓杰 ,
  • 石磊 ,
  • 陈佳玮 ,
  • 彭振 ,
  • 李元海
展开
  • (1. 中国矿业大学力学与土木工程学院, 江苏徐州 221116; 2. 中国矿业大学深部岩土力学与地下工程国家重点实验室, 江苏徐州 221116; 3. 中交(广州)建设有限公司, 广东广州 511458)
唐晓杰(1993—),男,江苏无锡人,中国矿业大学岩土工程专业在读硕士,主要研究方向为岩土工程数字照相量测技术与地下工程。Email: tangxiaojie_edu@163.com。*通信作者: 陈佳玮, Email: Chenjiawei_work@163.com。

收稿日期: 2018-06-25

  修回日期: 2018-12-03

  网络出版日期: 2019-03-05

基金资助

国家重点基础研究发展计划973项目(2014CB046905)

Analysis of Surrounding Rock Deformation Control of Largespan Metro Tunnel Crossing Fault by Combined Tunneling Method

  • TANG Xiaojie ,
  • SHI Lei ,
  • CHEN Jiawei ,
  • PENG Zhen ,
  • LI Yuanhai
Expand
  • (1.School of Mechanics and Civil Engineering, China University of Mining and Technology, Xuzhou 221116, Jiangsu,  China; 2. State Key Laboratory for Geomechanics & Deep Underground Engineering, China University of Mining and  Technology, Xuzhou 221116, Jiangsu, China; 3. China Communications Construction Company (Guangzhou) Ltd., Guangzhou 511458, Guangdong, China)

Received date: 2018-06-25

  Revised date: 2018-12-03

  Online published: 2019-03-05

摘要

以深圳轨道交通2号线新莲区间隧道为工程背景,针对大跨地铁隧道穿越断层的围岩变形与控制问题,采用FLAC3D数值模拟,分析双侧壁导坑工法与CD工法不同组合穿越断层的围岩变形规律与注浆控制效果。结果表明: 1)隧道穿越断层破碎带时,Ⅳ、Ⅴ级围岩交界并与断层相交的拱顶处以及Ⅴ级围岩与断层相交的拱腰处的围岩位移最大,是变形控制的关键部位; 2)双侧壁导坑法穿越断层对大跨地铁隧道的围岩变形控制较好,工程实际工法组合下围岩变形的最大影响范围为12.4 m,围岩位移控制较好,工法组合合理有效; 3)注浆加固对断层破碎带处围岩变形模式的影响与控制作用明显,注浆后围岩变形区域由未注浆的“枣核形”变为较均匀的“椭圆形”; 4)提出位移控制率均值的概念,以定量描述围岩的注浆效果,隧道穿越断层时3 m厚度注浆的围岩位移控制率均值达51%,围岩变形控制效果较优。

本文引用格式

唐晓杰 , 石磊 , 陈佳玮 , 彭振 , 李元海 . 大跨地铁隧道组合工法穿越断层时的围岩变形控制分析[J]. 隧道建设, 2019 , 39(2) : 227 -239 . DOI: 10.3973/j.issn.2096-4498.2019.02.007

Abstract

The surrounding rock deformation laws and grouting control effect of largespan XinxiuLiantang Port Tunnel on Shenzhen Rail Transit Line No. 2 are analyzed by FLAC3D numerical simulation method when adopting different combinations of doubleside drift method and CD method crossing fault. The analytical results show that: (1) The maximum displacement occurs at two key deformation control areas, i.e. the intersection of crown top between grade Ⅳ/Ⅴ surrounding rock boundary and the fault zone and the intersection of waist between grade Ⅴ surrounding rock and the fault zone, when tunnel crosses fault and fracture zone. (2) The deformation of surrounding rock is under effective control by adopting doubleside drift method when largespan metro tunnel crosses fault zone; and the maximum influencing scope of surrounding rock under actual construction method combination is 12.4 m. (3) The grouting around the fault and fracture zone has a good effect on surrounding rock deformation mode and control; and the shape of surrounding rock deformation area turned from a date pit to an uniform oval. (4) A quantitative description of the grouting control effect is proposed in surrounding rock displacement. The vertical displacement control rate of surrounding rock with 3 m grouting thickness reaches 51%, which shows a good surrounding rock deformation control effect.

文章导航

/

〈 〉