- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
Key Technology of Overlength Pressure Tunnel in Water Supply Project in Central City of Jilin Province(吉林引松工程超长有压隧洞关键技术)
收稿日期: 2018-10-26
修回日期: 2019-02-20
网络出版日期: 2019-05-01
吉林引松工程超长有压隧洞关键技术
Received date: 2018-10-26
Revised date: 2019-02-20
Online published: 2019-05-01
Water Supply Project in the Central City of Jilin Province is a large scale project which involves complex geological condition and high technical difficulties. In order to maximize the water delivery, the overlength pressure hydraulic tunnel is introduced. Based on detailed geological survey and other reliable technical references, this project can be treated as a demonstration in terms of how to lay large diameter TBM through a karst area with limestone. The insitu test is introduced to test the nonbonded prestress circumferential anchor tunnel structure and culvert structure when the water transmission engineering line crosses the shallowburied valley section. The Class Ⅰ and Class Ⅱ granite tunnels excavated by TBM is not aligned with saving project investment and speeding up construction progress. The BQ method is introduced to analyze the rock quality classification of long tunnels. There are not many domestic engineering examples of the abovementioned key technologies, and there are no mature theories and experiences to refer to. Based on theoretical research, numerical calculations, model tests, and productive insitu tests, those key technical problems of ultralong and pressurized tunnels are solved. This project has a great theoretical and engineering value.
QI Wenbiao , LIU Yang , XUE Xingzu , XU Shiming , MA Zhenzhou . Key Technology of Overlength Pressure Tunnel in Water Supply Project in Central City of Jilin Province(吉林引松工程超长有压隧洞关键技术)[J]. 隧道建设, 2019 , 39(4) : 684 -693 . DOI: 10.3973/j.issn.2096-4498.2019.04.020
/
| 〈 |
|
〉 |