- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
Key Techniques for Construction of Sanyang Road CrossriverTunnel of Wuhan Rail Transit Line 7(武汉轨道交通7号线三阳路越江隧道施工关键技术)
收稿日期: 2019-01-16
修回日期: 2019-05-09
网络出版日期: 2020-03-11
武汉轨道交通7号线三阳路越江隧道施工关键技术
Received date: 2019-01-16
Revised date: 2019-05-09
Online published: 2020-03-11
The author focuse on the great challenges encountered during the tunneling process in the Wuhan Sanyang Road Tunnel, and the key techniques adopted to solve those problems. When tunneling in composite strata, engineers inevitably face problems such as inefficient excavation, excessive tool wear, excavation face instability and the risk of clogging. The TBM used in the project allows tool change under atmospheric pressure, which improves the efficiency of tool change and eliminated the risk of casualties during hyperbaric interventions. In terms of the tool wear and clogging, the authors propose technical solutions as follows: the optimization of the tool′s type and configuration, improvement of the central flushing system and chemical dissolution of clogging. The results indicate that through the countermeasures proposed, the tunneling efficiency can be improved effectively. They also reduce the cutter change frequency and eliminate the risk of TBM downtime. The technical achievements obtained in the construction of the Wuhan Sanyang Road Tunnel can provide technical reference for the construction of largediameter shield tunnels in composite strata in the future.
LI Bo , BAO Zhen . Key Techniques for Construction of Sanyang Road CrossriverTunnel of Wuhan Rail Transit Line 7(武汉轨道交通7号线三阳路越江隧道施工关键技术)[J]. 隧道建设, 2019 , 39(5) : 820 -831 . DOI: 10.3973/j.issn.2096-4498.2019.05.014
/
| 〈 |
|
〉 |