- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2018-12-03
修回日期: 2019-04-23
网络出版日期: 2019-07-31
基金资助
中国铁路总公司科技研究开发计划 (2016G002-A); 中国中铁股份有限公司科技开发计划基金项目(2016-重大专项-01); 中国中铁股份有限公司科技开发计划项目(2014-重点-24); 中国中铁股份有限公司科技开发计划项目(2015-重点-70)
Discussion on Clearance Area of 400 km/h Highspeed Railway Tunnel Based on Rail Vehicle Internal Transient Pressure
Received date: 2018-12-03
Revised date: 2019-04-23
Online published: 2019-07-31
为推进中国高速铁路隧道技术标准深化研究,开展400 km/h隧道结构设计参数的研究工作,而隧道净空面积为其中的一项重要内容。为尝试从列车内部瞬变压力角度得到400 km/h高速铁路隧道净空面积,建立基于舒适度标准的高速铁路隧道净空面积确定方法,以控制工况为基础,通过计算和分析,从列车密封性能方面讨论维持现有隧道净空断面的可能性,并研究提出400 km/h隧道净空断面建议值。主要结论有: 1)现有350 km/h单线隧道以400 km/h运营时,列车动态密封指数最低为22 s,车内瞬变压力超标的可能性较大; 2)400 km/h单、双线隧道净空面积建议值分别为85 m2和100 m2,对应的列车动态密封指数最低为18 s,更加符合现有标准对列车密封性能的要求,车内瞬变压力超标的可能性大幅降低; 3)提出的400 km/h高速铁路隧道净空面积建议值和对应的密封性能要求可为有关标准、规范的制订提供参考。
史宪明 , 吴剑 , 万晓燕 , 陈洋宏 . 基于车内瞬变压力变化的400 km/h高速铁路隧道净空面积探讨[J]. 隧道建设, 2019 , 39(7) : 1118 -1124 . DOI: 10.3973/j.issn.2096-4498.2019.07.007
The research on structural design parameters of 400 km/h highspeed railway tunnel is being carried out in order to promote the technical standards of highspeed railway tunnels in China, and in which the tunnel clearance area is one of the key items. The method for determining the clearance area of highspeed railway tunnel on the basis of passenger ear comfort standard is established from the aspect of rail vehicle internal transient pressure. Based on the control condition, the probability for maintaining existing tunnel clearance area is discussed in terms of rail vehicle airtightness by calculation and analysis. And the suggested clearance area of 400 km/h tunnel is proposed. The conclusions are drawn as follows: (1) The lowest train dynamic airtightness index is 22 s when the existing 350 km/h singleline tunnel operates at a speed of 400 km/h, and the rail vehicle internal transient pressure exceeds the passenger ear comfort standard may be a high probability event. (2) The suggested clearance areas of singleline and doubleline 400 km/h tunnels are 85 m2 and 100 m2 respectively, and the corresponding train dynamic seal index is 18 s, which is more reasonable to the existing train and therefor the risk of exceeding standard can be greatly reduced. (3) The suggested clearance area for 400 km/h highspeed railway tunnels and corresponding airtightness requirements can be taken as the reference for relevant standards and specifications.
/
| 〈 |
|
〉 |