- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2019-01-25
修回日期: 2019-04-22
网络出版日期: 2019-07-31
基金资助
中国铁路总公司科技研究开发计划(2016G004-A);中铁隧道集团科技创新计划(隧研合2016-03,隧研合2018-06);中铁建投科技创新计划课题(201601-3);深圳地铁集团科研课题(ZHDT-KY035/2017);河南省自然科学基金(182300410197)
Innovative Design and Application of Caiyun TBM to Gaoligongshan Railway Tunnel
Received date: 2019-01-25
Revised date: 2019-04-22
Online published: 2019-07-31
谢成涛 , 赵海雷 . 高黎贡山铁路隧道彩云号TBM的创新性设计与应用[J]. 隧道建设, 2019 , 39(7) : 1201 -1208 . DOI: 10.3973/j.issn.2096-4498.2019.07.018
Gaoligongshan Tunnel, as a key control project of DaliRuili Railway, is characterized by three highs and four actives. During TBM construction, disasters such as fault fracture zone, mud gushing, rock burst, etc., would be encountered. As a result, the variable crosssection lifting excavation method is adopted for the main tunnel TBM design; and as well, some innovative technologies, i.e. preautomatic concrete spraying, concealed and normalized advance drilling and waterrock integration advance prediction, are used. The construction practice shows that the innovative designs of TBM have played a significant role in the excavation process and can provide reference for the design and application of TBM to similar geological conditions in the future.
/
| 〈 |
|
〉 |