Demolition of Temporary Support and Rapid Construction Technology of Secondary Lining Structure in Super Large Crosssection Mined Cavern: a Case Study on Shenzhen Foreign Languages School Station on Shenzhen Metro Line 8
Online published: 2020-11-01
王帅帅
,
蔡唐涛
,
伍春
,
许前顺
,
高波
.
超大断面暗挖洞室临时支撑拆除及二次衬砌结构快速施工技术——以深圳地铁8号线深外站为例
A mined station and the connecting line secondary lining of Shenzhen Foreign Languages School Station on Shenzhen Metro Line No. 8 are characterized by super large crosssection, complex dismantling technology and difficult construction organization. To overcome these problems, the lining face in tunnel is optimized to 4 to reach smooth construction organization based on construction organization of 7 working faces and the castinplace scheme of vertical multilayer support and considering the construction site conditions, schedule node arrangement and construction organization mode. And with the application of large crosssection secondary lining trolley, the number of vertical layered pouring and the workload of support formwork has been reduced, and the overall construction progress has been accelerated. Finally, based on the finite element numerical simulation, the deformation law of the supporting structure in the whole process of excavation, demolition of temporary support and construction of secondary lining of the super large crosssection mining project is analyzed, and the analytical results coincide with the actual conditions well, indicating that the deformation is within control. By optimizing the construction organization and adopting the secondary lining trolley, the construction progress has been greatly improved on the premise of ensuring safety and quality, the construction period has been saved by 52 days, and the construction cost has been reduced by RMB1.15 million yuan.
/
| 〈 |
|
〉 |