- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
敞开式顶管机改造及洞内组装升级泥水平衡顶管机施工技术——以深圳电网北环110 kV架空线改造入地电缆隧道工程为例
网络出版日期: 2020-12-09
Transformation, Assembling and Construction Technology of Open Pipe Jacking Machine to Slurry Balanced Pipe Jacking Machine in Tunnel:
a Case Study on Shenzhen 110 kV Overhead Line Transformation into Ground Cable Tunnel Project
(1. The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China; 2. School of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510641, Guangdong, China)
Online published: 2020-12-09
董志伟
,
丁小彬
,
杨永强
,
张超
.
敞开式顶管机改造及洞内组装升级泥水平衡顶管机施工技术——以深圳电网北环110 kV架空线改造入地电缆隧道工程为例
/
| 〈 |
|
〉 |