沉管预制全断面大型液压模板台车设计与应用技术

  • 朱金波 ,
  • 王聪
展开
  • (1.中交第二航务工程局有限公司第五工程分公司, 湖北 武汉 430040; 2.中交第二航务工程局有限公司,湖北 武汉 430040; 3.长大桥梁建设施工技术交通行业重点实验室, 湖北 武汉 430040; 4.交通运输行业交通基础设施智能制造技术研发中心, 湖北 武汉 430040)
朱金波(1994—),男,宁夏固原人,2016年毕业于长安大学,公路工程管理专业,本科,助理工程师,主要从事地下暗埋隧道施工工作。E-mail: 562655360@qq.com。

网络出版日期: 2021-01-03

Design and Application Technology of Fullsection Large Hydraulic Formwork Trolley for Immersed Tunnel Segment Prefabrication

  • ZHU Jinbo ,
  • WANG Cong
Expand
  • (1. No. 5 Branch of CCCC Second Harbor Engineering Co., Ltd., Wuhan 430040, Hubei, China; 2. CCCC Second Harbor Engineering Company Ltd., Wuhan 430040, Hubei, China; 3. Key Laboratory of Largespan Bridge Construction Technology, Wuhan 430040, Hubei, China; 4. Research and Development Center of Transport Industry of Intelligent Manufacturing Technologies of Transport Infrastructure, Wuhan 430040, Hubei, China)

Online published: 2021-01-03

摘要

沉管分次预制施工周期较长、纵向施工缝渗水风险较大, 而常规钢木混合体系模板难以满足全断面预制一次浇筑成型的质量与进度要求。为解决上述问题,研制出一款可自行走的全断面液压模板台车,其内模台车采用三角形桁架结构及液压步履式自行走系统,可实现内模台车的快速移位;外模台车采用无拉杆斜支撑桁架结构,可降低结构的渗水风险;端模采用梳齿型组合钢模,可提高周转利用率;同时,外模台车可为体系转换提供条件,节约施工周期。通过ANSYS软件对混凝土浇筑过程中的模板变形和位移数值进行模拟,实践证明,该模板台车可保证沉管全断面顺序预制工艺的实施和浇筑安全。

本文引用格式

朱金波 , 王聪 . 沉管预制全断面大型液压模板台车设计与应用技术[J]. 隧道建设, 2020 , 40(12) : 1817 -1823 . DOI: 10.3973/j.issn.2096-4498.2020.12.017

Abstract

The prefabrication of immersed tube in stages always has long construction term and greater risk of water seepage at longitudinal construction joints, while  for integral fullsection prefabrication, it is difficult to meet the requirements of fullface prefabrication quality and schedule with conventional steelwood mixed formwork system. To solve these problems, a fullsection hydraulic formwork trolley with selfwalking function is developed. The inner formwork trolley adopts triangular truss structure and hydraulic crawlertype selfpropelled system to realize rapid shift. The outer formwork trolley adopts inclined support truss without tie rod to reduce the risk of water seepage. The end formwork adopts combtooth type composite steel to increase turnover utilization rate. Meanwhile, the outer formwork trolley is helpful for system conversion and saving construction period. Finally, the finite element ANSYS is used to simulate and calculate the deformation and displacement of formwork in the process of concrete pouring. The practice results show that the formwork trolley used can guarantee successful prefabrication in fullsection of immersed tunnel segment and concrete pouring safety.