- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
Design Method for Support Structure of Large Crosssection Tunnels in Hubei on ZhengzhouWanzhou Railway Constructed by Mechanized Means(大断面隧道机械化施工支护结构设计方法)
网络出版日期: 2021-02-08
基金资助
国家自然科学基金(51578458,51878567,51878568); 中国铁路总公司科技研究开发计划(2017G007-H,2017G007-F,K2018G014)
Design Method for Support Structure of Large Crosssection Tunnels in Hubei on ZhengzhouWanzhou Railway Constructed by Mechanized Means
Online published: 2021-02-08
TONG Jianjun , LIU Dagang , ZHANG Xiao , WANG Zhilong , ZHAO Siguang , LI Jiawang . Design Method for Support Structure of Large Crosssection Tunnels in Hubei on ZhengzhouWanzhou Railway Constructed by Mechanized Means(大断面隧道机械化施工支护结构设计方法)[J]. 隧道建设, 2021 , 41(1) : 116 -125 . DOI: 10.3973/j.issn.2096-4498.2021.01.013
/
| 〈 |
|
〉 |