砂卵石地层大直径盾构始发下穿管线群施工技术——以成都轨道交通17号线温明区间盾构工程为例

  • 王德勇 ,
  • 赵东平 ,
  • 艾小杨 ,
  • 王卢伟
展开
  • (1. 中交一公局西南工程有限公司, 四川成都 610091; 2. 西南交通大学 交通隧道工程教育部重点实验室,四川成都 610031; 3. 西南交通大学土木工程学院, 四川成都 610031)
王德勇(1984—),男,重庆人,2007年毕业于西南交通大学,土木工程专业,本科,工程师,主要从事隧道施工技术管理工作。E-mail: 453349100@qq.com。*通信作者: 赵东平, E-mail: 704215958@qq.com。

网络出版日期: 2021-03-22

Construction Technology of LargeDiameter Shield Launching underneath Pipeline Group in SandyCobble Strata: a Case Study of Shield Tunnel of 〖JP3〗Wenquan Avnue StationMingguang Station Section on Chengdu Metro Line 17

  • WANG Deyong ,
  • ZHAO Dongping ,
  • AI Xiaoyang ,
  • WANG Luwei
Expand
  • (1. Southwest Engineering Co., Ltd. of CCCC First Highway Engineering Co., Ltd., Chengdu 610091, Sichuan, China; 2. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031, Sichuan, China; 3. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, Sichuan, China)

Online published: 2021-03-22

摘要

为解决砂卵石地层大直径盾构始发下穿高压燃气管线群的沉降控制技术难题,以成都轨道交通17号线一期工程TJ06标温泉大道站—明光站区间盾构隧道工程为依托,采用方案论证及现场实测等手段,对地铁大直径盾构始发下穿管线群加固方案、施工工艺及控制参数等开展研究。结果表明: 1)采用双层大管棚、袖阀管注浆及井点降水组合方案可有效控制砂卵石地层盾构始发地表沉降; 2)采用条形基础加固+钢丝悬吊固定的保护措施可有效控制砂卵地层管线沉降; 3)在相同地质条件及埋深地段盾构掘进试验基础上,提出砂卵石地层始发穿越管线时盾构掘进两阶段控制参数建议值; 4)管线沉降监测数据表明,盾构施工过程中管线累计沉降小于控制标准。

本文引用格式

王德勇 , 赵东平 , 艾小杨 , 王卢伟 .

砂卵石地层大直径盾构始发下穿管线群施工技术——以成都轨道交通17号线温明区间盾构工程为例

[J]. 隧道建设, 2020 , 40(S2) : 256 -263 . DOI: 10.3973/j.issn.2096-4498.2020.S2.033

Abstract

The settlement control is of great significance in largediameter shield launching underneath highpressure gas pipeline group in sandycobble strata. Hence, researches are conducted on reinforcement scheme, construction technology and parameters control of a largediameter shield launching underneath pipeline group at Wenquan Avnue stationMingguang station section on Chengdu metro line 17 using program demonstration and onsite measurement methods. The results show the following. (1) The surface settlement induced by the shield launching in sandycobble strata can be effectively controlled using combination scheme of doublelayer large pipe roof, Soletanche grouting and well point dewatering. (2) The settlement of pipeline in sandycobble strata can be effectively controlled by adopting the protection measures of strip foundation reinforcement and steel wire suspension fixation. (3) The recommended twostage control parameters for shield launching underneath pipeline in sandycobble strata are proposed based on the excavation test of shield tunnel in the same geological conditions and buried depth. (4) The pipeline settlement monitoring data show that the cumulative settlement of the pipeline during shield tunneling is within the control standard.
文章导航

/

〈 〉