为快速解决大瑞铁路高黎贡山隧道出口端 TBM掘进D1K224+200~+230里程段后出现的突泥涌水地质灾害、隧道塌方冒顶、 TBM被关在掌子面、皮带传送机中断等问题。根据隧道工程地质条件和施工开挖过程情况,分析隧道突涌原因,借鉴国内富水全风化花岗岩突涌处治经验,提出在隧道洞身地表河道改修、塌坑回填、深孔加固,确保洞顶稳定和防止水流下渗,同时在突涌体两端施作注浆加筋挡墙,为洞内清淤和 TBM恢复掘进提供安全保障,形成了“高位锁口、泄水降压、两头夹击、支护加强、快挖快封”的施工技术措施对溃口进行处理,成功解决了富水风化花岗岩隧道溃口的突涌塌方冒顶的技术难题。
After the TBM boring in the exit end of the
Gaoligongshan tunnel of the DaliRuili railway at section D1K224+200~+230, sudden water and mud
outburst occur, which leads to tunnel collapse, TBM jam, and belt conveyor
stop. As a result, the causes for water and mud outburst are analyzed, and a
series of techniques such as surface river channel repair, collapse cave
backfilling, and deephole grouting reinforcement are
conducted to guarantee the tunnel roof stability and prevent water inrush based
on treatment experience of water and mud outburst in waterrich fullyweathered granite. Meanwhile, the
grouting reinforcement retailing walls are conducted on both sides of water and
mud outburst point to provide safety guarantee for mud clearing and TBM reboring. A treatment scheme of highlevel
lock, discharge and depressurization, twoend stop,
support strengthening, and fastexcavation and fast
seal is formed, which has successfully solved the water and mud outburst in
tunnel in waterrich weathered granite.