Establishment and Application of "1 km+100 m+50 m" Geological Prediction System for ExtraLong TBM Tunnels: a Case Study on Water Supply Project Ⅱ in Xinjiang, China(超特长隧洞TBM施工“115”超前地质预报系统创建与实践——以北疆供水二期工程为例)
网络出版日期: 2021-10-01
基金资助
国家自然科学基金优秀青年科学基金(52022053); 国家自然科学基金面上项目(51879153); 山东省自然科学基金杰出青年科学基金(ZR201910270116)
Establishment and Application of "1 km+100 m+50 m" Geological Prediction System for ExtraLong TBM Tunnels: a Case Study on Water Supply Project Ⅱ in Xinjiang, China
(1. Xinjiang Erqis River Basin Development and Construction Administration Bureau, Urumqi 830000, Xinjiang, China; 2. Geotechnical and Structural Engineering Research Institute, Shandong University, Jinan 250061, Shandong, China)
Online published: 2021-10-01
关键词: 超特长隧洞; TBM施工; 地质灾害; “115”超前地质预报系统
邓铭江
,
许振浩
,
刘斌
.
Establishment and Application of "1 km+100 m+50 m" Geological Prediction System for ExtraLong TBM Tunnels: a Case Study on Water Supply Project Ⅱ in Xinjiang, China(超特长隧洞TBM施工“115”超前地质预报系统创建与实践——以北疆供水二期工程为例)
/
| 〈 |
|
〉 |