复杂地质条件下TBM刀具失效形式及原因分析与应对措施
(1. 中铁隧道局集团有限公司, 广东 广州 511458; 2. 中南大学土木工程学院, 湖南 长沙 410075; 3. 盾构及掘进技术国家重点实验室, 河南 郑州 450001; 4. 中铁隧道股份有限公司, 河南 郑州 450001)
网络出版日期: 2022-01-28
基金资助
中国中铁股份有限公司科技研究开发计划(2020-重大-04); 河南省自然科学基金项目(202300410002)
Forms and Causes of Failure in Tunnel Boring Machine Cutters under Complex Geological Conditions and Corresponding Countermeasures
(1. China Railway Tunnel Group Co., Ltd., Guangzhou 511458, Guangdong, China; 2. School of Civil Engineering, Central South University, Changsha 410075, Hunan, China; 3. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China; 4. China Railway Tunnel Stock Co., Ltd., Zhengzhou 450001, Henan, China)
Online published: 2022-01-28
冯欢欢 , 王树英 , 杨露伟 , 杨延栋 , 王文超 , 夏明 . 复杂地质条件下TBM刀具失效形式及原因分析与应对措施[J]. 隧道建设, 2022 , 42(1) : 130 -136 . DOI: 10.3973/j.issn.2096-4498.2022.01.016
Complex geological conditions and unreasonable tunneling parameters cause abnormalities or damage to tunnel boring machine(TBM) cutters, increasing cutter consumption and affecting tunneling efficiency. The common failure modes of TBM cutters are discussed. In addition, the influence of driving parameters, such as total thrust, cutterhead rotation speed, and cutter penetration, as well as the geological parameters, such as the uniaxial compressive strength and the quartz content of different surrounding rocks, on cutter wear and abnormal damage are investigated. Furthermore, case studies on the Qinling tunnel of Hanjiang riverWeihe river water conveyance and Zhongtianshan tunnel projects are conducted, statistically analyzing the consumption and the failure forms of the cutters. Thereafter, optimization methods based on cutter selection, inspection, and maintenance are proposed. Finally, the current situation under which some problems exist in the cutter configuration and monitoring technology is introduced. It is concluded that cutter configuration technology with adjustable cutter spacing should be further developed to ensure the rockbreaking efficiency of cutters under various geological conditions. In addition, there is a need for new cutter condition monitoring systems with strong adaptability to the TBM working environment.
/
| 〈 |
|
〉 |