Technical Innovation in Construction of UltraDeep Shaft of Wangjing Tunnel of BeijingShenyang HighSpeed Railway
Online published: 2022-09-09
李义华 , 翟志国 , 许维青 , 刘柳 . 京沈客专望京隧道超深竖井施工技术革新[J]. 隧道建设, 2022 , 42(8) : 1482 -1490 . DOI: 10.3973/j.issn.2096-4498.2022.08.018
Many problems, including complex groove creation, challenging management of verticality, and challenging safety and quality control of foundation pits, were encountered during the construction of the 68m deep No.2 shaft of Wangjing tunnel of BeijingShenyang passengerdedicated line. This tunnel is located in soft strata with fine sand layers that are predominately covered by rich confined water. This led to the adoption of a number of technical innovations for ultradeep diaphragm walls, including a double Ishaped steel joint column, steel support instead of concrete support in the upper half of the foundation pit, ring frame beam, and concrete internal support reversed in the bottom half of the foundation pit, a combination of ring frame beam and waist beam, improved joint waterproof, and modification of the shaft main structure construction technology. As a result, the following conclusions are drawn: (1) By using the double Ishaped steel joint column in the soft stratum with rich groundwater, the verticality of the ultradeep diaphragm wall can be considerably enhanced, and the water leakage of the joints can be decreased. (2) By combining the temporary support structure and permanent structure and optimizing the internal support structure system and the main structure construction sequence of the ultradeep shaft, the construction process can advance more quickly, the safety can be increased, and the costs.
/
| 〈 |
|
〉 |