为研究适用于城市核心区的最优沉管隧道的结构类型和预制方案,以广州市琶洲西隧道工程为例,对城市核心区沉管隧道结构类型及预制方案进行综合比选分析,分别对比钢壳组合结构(二次浇筑混凝土)、钢壳组合结构(一次浇筑混凝土)、钢筋混凝土结构(新建干坞)、钢筋混凝土结构(移动干坞)4种方案的优缺点,最终选择钢壳组合结构(二次浇筑混凝土)的方案。采用小截面双层钢壳混凝土沉管隧道的结构型式,结合长距离高干舷运输、二次浮态浇筑混凝土等先进施工工艺,可以有效地解决城市核心区域沉管隧道建设工程中干坞用地紧张等困难,同时有工期短、河道疏浚少、工程质量可靠、环保等优势,在内河沉管隧道中有广泛的应用前景。
A case study is conducted on the Pazhou west tunnel
project in Guangzhou, China, and the structural type and prefabrication scheme
of immersed tunnels in urban core areas are comprehensively compared to select
an optimal structural type and prefabrication scheme of immersed tunnels in the
urban core area. Then, the advantages and disadvantages of steelshell
composite structure (secondary pouring concrete), steelshell composite structure (primary pouring concrete), reinforced
concrete structure (new dry dock), and reinforced concrete structure (mobile
dry dock) are analyzed and compared. The final scheme is selected as the steelshell composite structure (secondary pouring concrete). The
difficulties of dry dock land shortage in the construction project of immersed
tunnel in the urban core area can be solved by adopting the structural type of
smallsection doublelayer
steelshell concrete immersed tunnel and employing
advance construction technologies, such as longdistance
high freeboard transportation and secondary floating concrete pouring. The
method adopted has the advantages of a short construction period, less river
dredging, reliable engineering quality, and environmental protection, which
will be widely used in the immersed tube tunnel under inland rivers.