Research on Design Technology of Sequential Supporting for High-Speed Railway Tunnel Constructed by Drilling-and-Blasting Method(高速铁路钻爆法隧道分序支护设计技术研究)

  • 肖明清 ,
  • 徐晨 ,
  • 谢壁婷 ,
  • 陈文鹏 ,
  • 王克金
展开
  • (1. 中铁第四勘察设计院集团有限公司, 湖北 武汉430063; 2. 水下隧道技术国家地方联合工程研究中心, 湖北 武汉430063)
肖明清(1971—),男,湖南邵阳人,1992年毕业于西南交通大学,地下工程与隧道专业,博士,正高级工程师,现从事隧道与地下工程的设计与研究工作。E-mail: tsyxmq@163.com。*通信作者: 徐晨, E-mail: 1107176374@qq.com。

网络出版日期: 2023-04-17

Research on Design Technology of Sequential Supporting for High-Speed Railway Tunnel Constructed by Drilling-and-Blasting Method

  • XIAO Mingqing ,
  • XU Chen ,
  • XIE Biting ,
  • CHEN Wenpeng ,
  • WANG Kejin
Expand
  • (1. China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, Hubei, China; 2. National and Local Joint Engineering Research Center of Underwater Tunneling Technology, Wuhan 430063, Hubei, China)

Online published: 2023-04-17

摘要

为进一步提升隧道智能建造水平,加快施工进度,以量化设计为前提,全过程质量控制标准为基础,提出隧道支护分序技术。以宜兴高铁隧道智能建造试验段为对象,对不同围岩的分序支护设计方案、施工期的安全性、进度提升效果等进行研究,得出以下结论: 1)在保证支护结构强度增长速度不低于围岩压力增长速度时,初期支护分序施工是可行的,可以保证施工安全。2)一序初期支护应充分发挥围岩的自承载作用,同时满足围岩压力增长和支护强度匹配要求,补强初期支护滞后距离在满足多工序作业循环所需施工设备排布空间要求的同时,尽可能缩短布置长度,以利于发挥初期支护的早承载功能。3)分序支护建立在量化设计和精细化施工基础上,因此需要严格控制隧道施工质量和支护时机。4)以宜兴铁路350 km/h单洞双线隧道智能化工区试验段为例,Ⅲa衬砌A型分序、B型分序,Ⅳa衬砌C型分序方案对应的施工进度可分别提高46.5%、14.7%、9.36%。

本文引用格式

肖明清 , 徐晨 , 谢壁婷 , 陈文鹏 , 王克金 . Research on Design Technology of Sequential Supporting for High-Speed Railway Tunnel Constructed by Drilling-and-Blasting Method(高速铁路钻爆法隧道分序支护设计技术研究)[J]. 隧道建设, 2023 , 43(3) : 369 -382 . DOI: 10.3973/j.issn.2096-4498.2023.03.002

Abstract

Sequential supporting technology is proposed based on the quantitative design and the quality control standard of the whole construction process, in order to further improve the intelligent construction level of the tunnel and accelerate the construction advance rates. With the intelligent construction of the trial sections of tunnels on YichangXingshan highspeed railway as the research object, the design of the sequential supporting for different surrounding rocks, the safety during the construction and the advance rate improvement effect are comprehensively studied, and the following conclusions are drawn: (1) When the growing rate of the strength of the supporting structure is not lower than that of the pressure of the surrounding rock, it is feasible to construct sequential primary supporting and the construction safety can be ensured. (2) Sequence I primary supporting shall give full play to the selfbearing function of the surrounding rock and meet the requirements of the matching between the surrounding rock pressure growing and the support strength. The lag distance of Sequence Ⅱ reinforcing primary supporting shall be as short as possible while meeting the requirements of the space required by the construction equipment needed for multiprocess operation cycles, so as to give full play to the early loadbearing function of the primary support. (3) Sequential supporting is based on quantitative design and precise construction, so it is necessary to strictly control the tunnel construction quality and the supporting opportunity. (4) Sequential supporting is applied in the trial sections of tunnels on YichangXingshan highspeed railway, and the construction advance rates of Ⅲa Type A, Ⅲa Type B, and Ⅳa Type C sequential supporting are increased by 46.5 %, 14.7 %, and 9.36 % respectively.