超高水压盾尾密封性能试验台设计与研究
网络出版日期: 2023-06-20
Design and Research of Test Bed for Sealing Performance of Shield Tail Under UltraHigh Water Pressure
Online published: 2023-06-20
李大伟 , 沈桂丽 , 杨建权 , 石安政 . 超高水压盾尾密封性能试验台设计与研究[J]. 隧道建设, 2023 , 43(5) : 874 -878 . DOI: 10.3973/j.issn.2096-4498.2023.05.015
To conduct an indepth investigation of the sealing performance of the shield tail under ultrahigh water pressure in principle, a test bed is developed based on mechanical, electrical, and hydraulic control technologies. The key design elements are as follows: (1) attitude design: The test bed can achieve axial movement, radial movement, and steering deflection by the expansion and contraction of oil cylinders, which can simulate the posture changes during the shield tunneling process; (2) oil supply design: Five shield tail brushes form four grease cavities for simulating the shield tail under ultrahigh water pressure; (3) design of an ultrahigh water pressure supply: A mudwater circulation pressuremaintaining system is designed for simulating ultrahigh water pressure outside the shield, which is safe, reliable, and can withstand a pressure reaching 2.5 MPa. Factors such as the mudwater pressure, number of grease cavities, shield tail grease and brush quality, shield tunneling attitudes, and segment dislocation, that affect the static and dynamic shield tail sealing performance under ultrahigh water pressure, are determined by subsequent tests.
/
| 〈 |
|
〉 |